Reservoir Operation
Rudyard Lake is a man made reservoir and is supplied from a feeder at the north end which runs from the river Dane. At the south end the dam incorporates a ‘spillway’ which determines the maximum level of the water in the lake;
History of the Dam
The Dam was designed by John Rennie and construction started in 1797 with Hugh Henshall as resident engineer. Shortly after the Dam was completed, cracks were found at its ends necessitating the Dam to be extended with wings at